
Modern homes ask far more of a single phase supply than the original installation was ever designed for. Braytech assesses whether you genuinely need three phase, and if you do, our Level 2 team upgrades the supply, mains and board as one job.
267 Google reviews
Upfront pricing
Quoted before we start.
Family owned
Local team, no subcontractors.
Level 2 ASP
Ausgrid + Endeavour approved.
Lifetime labour guarantee
Our work is backed for life.
Same day service
Fast response when it matters.
What the job includes
Plenty of homes that ask for three phase actually need a properly sized single phase supply and board. We tell you which one you are before quoting an upgrade you do not need.
New mains sized for the load, run overhead or underground depending on your property.
As Level 2 ASPs we handle the network notification, service work and metering changes involved.
New board with the phases balanced across circuits and full RCD protection, labelled clearly.
Ducted air conditioning, pool and spa plant, workshops, lifts and EV charging connected on correctly rated dedicated circuits.
When to call us
Three phase is usually worth considering when.
CALL 02 9055 8581How we work
We calculate the real maximum demand and check what the network can provide at your address.
The quote covers supply, mains, metering and board as one scope, so nothing appears later as an extra.
Applications and notifications with Ausgrid or Endeavour Energy are handled by us.
Mains, metering and board installed, phases balanced, everything tested and certified.
Why Braytech

4.9from 267 Google reviews
Often not. Many homes are better served by upgraded single phase mains and a properly sized board. Three phase becomes the right answer when total demand genuinely exceeds what single phase can carry, such as ducted air conditioning combined with pool plant, a workshop or multiple EV chargers.
The on-site work is typically a planned day or more depending on the mains run, but the overall timeline also depends on network approvals and metering. We set out the expected sequence when we quote rather than promising a date we do not control.
No. It changes the capacity available to your home, not the rate you pay. The benefit is being able to run large loads properly and safely.
Yes, and it is normally part of the same job. A three phase supply needs a three phase board with the circuits balanced across phases.
We cover every suburb in both regions. Start with your area below, or see the full list.
Call 02 9055 8581 or send the details and we’ll come back to you.